Improving trails and trail access in and near Nevada County (Northern California).
Saturday, June 04, 2011
Tribute Trail Ride Postponed
Because of high probability of rain showers on Saturday morning, the Tribute Trail Gala ride is postponed. We will try to reschedule this event ASAP.
Friday, June 03, 2011
Help Continue to Build the Tribute Trail in June
Matt Frietas passes along this information. A great project for local volunteers!
Please join us at our twice-a-week work days this June! Wednesday evenings (June 8, 15, 22, and 29): 4pm until dark Saturdays (June 11, 18, and 25): 9am to 2pm. Meet at the Pioneer Park Tennis Court parking lots on Nimrod St, as parking is limited at the site. We’ll carpool from the park.
Please come prepared with long pants (poison oak!), closed-toe shoes, gloves, and water. We’ll bring the snacks and cookies. Bring trail tools (shovels, mcleods, pulaskis, rock bars, and hoes) if you have them. All work days are weather dependent. We won’t be working if it’s pouring.
Come help us build a trail in Nevada City this June! For more information or questions regarding the volunteer days or the project please contact Matt Freitas at (530) 265-6090 ext. 251.
Friends of Deer Creek has partnered with the City of Nevada City to build a trail between Jordan Street and Providence Mine Road. This multi-use trail will be the south side of the Deer Creek Tribute Trail, and will eventually connect to the trail on the north side of the creek by way of a planned suspension bridge just downstream of the Nevada City Wastewater Treatment Plant.
Tuesday, May 24, 2011
South Yuba Ridge Trail Progress
Once this is done, BONC will complete a grant application to fund construction (likely an RTP grant). We are in need of volunteers to help prepare this application; please let us know if you are interested.
Wednesday, May 18, 2011
BONC Ride - Friday 5/20

Join us for a BONC intermediate-advanced paced ride this Friday, May 20 @ 5:30PM. Meet at the USFS Rangers office off Coyote Street in Nevada City (map). Helmets and waiver signature required. We'll ride trails in the Highway 20 corridor or over to Round Mountain.
Perhaps beer afterwards? See you there!
Thursday, May 12, 2011
Pioneer Rock Garden SAVED!

The USFS is planning a re-route of the lava rock garden on Pioneer near Washington Overlook. The original Forest Service plan was to close the rocky section, which the USFS suspected was eroding. The rocky section is also difficult to ride for equestrians.
THE GOOD NEWS: I met with the USFS in the field this week to discuss this, as I was concerned that we might lose one of the few fun technical sections of this trail. We walked the existing alignment and the new one. After lengthy discussion, I am happy to report that the USFS will likely keep the rocky section in tact!
The new plan is to only reroute the steep 100'-long section on the east end of the rock garden, as it presents an erosion problem, but leave the rest of the rocky section alone. Volunteers will build a new alternative trail route just uphill from the rock garden so that there will be a challenging alignment (the existing rock garden) and a new tamer section for equestrians and others. NOTE - All of this is tentative and pending USFS approval.
Want to support trail advocacy and improvement efforts like these? Join BONC today!
Monday, May 09, 2011
Tribute Trail Gala Ride - 6/4

Join BONC and the Nevada County Land Trust as we celebrate National Trails Day and the new Deer Creek Tribute Trail! We will being our ride on Saturday, June 4th @ 8:30AM. Meet at Pioneer Park in Nevada City. Helmets and waiver signature required.
We'll break into groups based on ability and ride trails close to town, starting with this new trail. This is a No Drop ride, and BONC will provide refreshments and perhaps swag afterwards.
This new trail begins at Pioneer Park in Nevada City, winds its way through the city streets, and then out Champion Road and onto a system of service roads, trails and canal banks to the new trail and the Deer Creek bridge site. Thanks to the hard work of Bill Haire and the Land Trust, this trail is open to all non-motorized users, including mountain bikers.
Come join the fun!
May Gala Ride Recap
Thank you to the Bicycle Recycle Project, which made a huge contribution to this event. Also kudos to Chris Rose for sweeping and making sure that no rider was left behind.
Thursday, April 28, 2011
MTB Tahoe North - 7/24 - 7/26
Join FATRAC, BONC and the Truckee Donner Land Trust as we celebrate a weekend of riding, more riding, beer, camping and trail building! This year, we will focus on North Shore fun as we camp at Martis Creek, ride classics like the Tahoe Rim Trail and work with the TDLT to build a new section of Donner Lake Rim Trail singletrack.
Please register online today:
Wednesday, April 27, 2011
BONC Gala Ride - Saturday 5/7, 10AM
"What is a Gala Ride? Good question.
We meet once a month for FUN casually paced group mountain bike rides at
different locations throughout Nevada County. ALL these rides are "NO-DROP
group rides (we will NOT leave you behind or get you lost). Rides usually last 2 to 3 hours and are great opportunities to meet other mountain bike riders at your skill level and discover the BEST trails in our area without having to do it by yourself! ALL BONC Gala Rides are FREE and open to the public and led by experienced local mountain bike riders familiar with the trails.
Groups for ALL Skill Levels:
Skill Building Beginner Group: The ride starts off slow and easy paced, focused on skill development and FUN!
Adventurer Intermediate Group: Moderate pace, we'll stop and enjoy the view once in a while and re-group, focus is developing skills, fitness, and FUN!
Advanced Group: Faster pace, little stopping along the way, sometimes challenging terrain and obstacles, keeping it FUN! (This is NOT a race group)
Join us for snacks and refreshments after the ride!
Date: Saturday May 7, 2011 (5/07/11)
Start Time: 10am (2-3 hours)
Start Location: Five Mile House
Route: Pioneer Trail (Hwy 20)
Skill level: No Drop, ALL Levels. (This means that we encourage beginners as well as advanced riders to join us)!
FREE Tune-up adjustments (Basic Tune-up) and equipment safety check for beginners.
* PLEASE contact us to schedule Tune-up on your bicycle (work on bicycles will be conducted at the Five Mile House before the ride)
Families welcome, this BONC Gala ride is along the historic Pioneer Trail and will serve ALL types of riders and skill levels.
Happy Trails!
BONC"
Monday, April 25, 2011
Kicking Butt and Building Singletrack
We had an especially fruitful day at Bullard on Saturday, building a new section of singletrack. BONC efforts continue to earn the admiration and gratitude of the Forest Service (see note below) as we open up great trails for everyone. More details about the event in our upcoming newsletter. Some pictures of our fantastic volunteers in action:"BONC:
I just want to thank all involved in the setting up and implementing the 200' reroute on Bullards Trail on 4/23/2011. From the pictures, it looks great and turned out just as planned. It is one of the biggest pleasures in my job to be working with the great folks like those who were part of this making things happen for benefit of the users and the environment. John, Moss is a great addition to the BONC group and will be a asset to the Bullards Trail System. Great job! Joe
Joe Chavez
Public Service Officer
Yuba River Ranger District"
Want to support these efforts? Become a BONC member today!
Wednesday, April 13, 2011
Trees Out at Bullards

Joe Chavez of the USFS asked me to pass along the good news that all downed trees have been taken out of the Bullards Bar trail system. Those of you who have ventured out there in recent months know what mess it had become. Volunteers are still needed for sections where the trailbed itself was damaged. We will accomplish this at our 4/23 event and open up the rest of the trails for the season.
As for the major erosion canyon west of Dark Day, it still remains. The USFS plans to repair this during the fall with a contractor who will fill in this section and carve in the trail (no reroute will occur). The CA Department of Boating and Waterways will fix the cause of the problem, which is runoff from a recently-built parking lot.
Sunday, April 10, 2011
Pictures: Round Mountain Volunteer Day 4/9
BONC volunteers put in some high quality work yesterday on the Rock Creek Flume Trail near Round Mountain. We rock armored one perpetually wet section, cut a re-route around a mud hole and improved drainage elsewhere. Full write up coming soon. See us in action here.
Want to support these efforts? Become a BONC member today!
Friday, March 25, 2011
Bullards Recon 4/3
BONC could use some volunteers to recon trail conditions at Bullards Bar for our upcoming trail work day later in April. Meet at the Camptonville USFS ranger station on Sunday, 4/3 at 10AM. Volunteers will scope out tree blowdowns and sections that need our help. A bit of trail work may occur, as well as a ride.
Accurate GPS devices could be handy.
Accurate GPS devices could be handy.
Culvert Trailwork
FATRAC and others will host a trail improvement day on the popular Culvert Trail on Saturday 3/25/11 at 9AM. Meet at the Mammoth Bar OHV area entrance at 9AM. Tools will be provided.
Friday, March 18, 2011
Support for Hole-in-the-Ground Parcel Acquisition
BONC has issued the following letter of support for the Trust for Public Land's effort to acquire parcels on which Hole-in-the-Ground trail is located.The TPL hopes to use a federal program to purchase parcels on which the Hole-in-the-Ground trail is located. Should they be successful, a large portion of the trail which is now fireroad could be converted to singletrack. Access to the trail would also become more permanent. The TPL has asked for letters of support for this program.
"The Honorable Diane Feinstein
United States Senate
Washington DC 20510
Dear Senator Feinstein:
I am writing in support of funding for the U.S. Forest Service program of checkerboard consolidation in the Sierra Nevada mountains. After a national ranking process, the FY 2012 President's Budget request recommended $2 million from the Land and Water Conservation Fund for the Sierra Nevada inholdings protection effort.
National forest lands entirely or substantially surround these checkerboard lands, and consolidation of these properties will give the Forest Service an improved ability to manage its lands for recreation. The inholdings feature significant trail resources. One tract is critical to accessing and improving the Hole-in-the-Ground-Trail a trail popular with mountain bikers.
For this reason, we support acquisition of this land (sec 3 and part of 9 of Township 17 North, Range 14 East).
Your strong support for the Land and Water Conservation Fund (LWCF) has been crucial to great conservation achievements in California and across the country. Your continued leadership on behalf of LWCF as Congress completes the FY 2011 budget and begins the FY 2012 process will help ensure that this project will receive the necessary funds.
Thank you for your support of protecting California's exceptional recreational resources.
Truly,
John Gardiner
Chair, Bicyclists of Nevada County"
Wednesday, March 16, 2011
Gala Ride with FATRAC - Sat 4/2

Note that this venue has changed to Round Mountain.
FATRAC will join us for a ride in our own backyard on Saturday, April 2, 2011. Meet at the Uren Street and Highway 20 @ 10AM. We'll show off some of our local Round Mountain singletrack stash to our flatlander friends (just kidding FATRAC :-).
This is a No Rider Left Behind ride, so everyone is welcome. We will provide New Belgium beer to adult participants. We will have BONC membership applications available so you can join up (membership is not required for the ride).
Monday, March 14, 2011
Bullards and Downed Trees
Joe Chavez of the USFS and others have put in many hours taking out down trees at the Bullards Bar trail system. Regardless, the place is a bit of a mess. Note that BONC will host a trailwork day on 4/23 to address these challenges. This update from Joe:"I had a chance to personally see the damage from the last heavy low elevation snow storm on the Bullards trail system yesterday (March 13). Myself, plus three moto volunteers went out to do some clearing. Its bad! I have never seen so many downed trees (many stump pulls on or near the trails), it looked like bombs went off in the area. It is 5 times worse than November's low elevation snow storm. We could not go more than 50 yards without coming across another downed tree. The current status of the trails is as follows:
TRAIL/STATUS
8-Ball/Cleared
Rebel Ridge/Cleared (Be aware of a stump pull hole adjacent to the trail towards the top end)
7-Ball/Cleared
Schoolhouse/Cleared (cleared by FS fire crews)
Bullards/Vista to Dark Day- cleared of logs, large washout near Dark Day (cleared by FS fire crews - FS has submitted for an internal grant to repair this - status on funding currently undetermined).
Dark Day to Camptonville- Many downed logs across the trail, several stump pulls near or on the trail (tread work will need to be done at the stump pulls and some minor reroutes will be needed to get around some damaged spots). Expert faller needed to clear area 1/3 mile west of Dark Day (I will be requesting continued help from the FS fire crews to assist with this). "
Wednesday, March 02, 2011
Bullards Trail Event Rescheduled to 4/23
Thursday, February 24, 2011
Round Mountain Event Rescheduled to 4/9

Because of snow and ice conditions, the Round Mountain trail day has been rescheduled to Saturday, April 9th @ 10AM.
In the meantime, please consider joining our Bullard's trail day + ride on Sunday, March 6th.
BONC March Newsletter
The BONC March newsletter is now available online. Please check it out to learn about local riding, trail building, advocacy and social events for our mountain bicycling community.
Subscribe to:
Posts (Atom)
